Start Here
New to solar permitting? Begin with the overview, then drill into the specific stage you need.
How Solar Permitting Works
The complete overview โ two separate processes, four stages, one system that can't turn on until both agencies say yes. Start here if you're new.
Read guide โSolar Permit Inspection: What to Expect
What the inspector checks at rough-in and final โ the actual checklist, common failures, and how to prepare so nothing gets missed.
Read guide โSolar Interconnection Application Steps
Step-by-step: from submitting the application to receiving Permission to Operate โ and how to avoid the delays that add weeks.
Read guide โHOA Solar Panel Rights by State
25+ states have laws limiting HOA authority over solar. What your HOA can and cannot do โ with a template approval request letter.
Read guide โWhat Happens If You Install Solar Without a Permit
Insurance, resale, and utility consequences โ and how to retroactively permit an existing unpermitted installation.
Read guide โNet Metering Explained
How solar credits work, state-by-state program differences, California NEM 3.0 explained, and how battery storage changes the math.
Read guide โSolar Permit Fees by State
What permit fees actually cost โ how they're calculated, state-by-state ranges, and what the penalty is for unpermitted work.
Read guide โHow Long Does a Solar Permit Take?
Realistic timelines by state, the biggest causes of delay, and the one decision that cuts 3โ6 weeks off total timeline.
Read guide โPulling Your Own Solar Permit
Owner-builder solar permitting โ what states allow it, what the electrical license requirement means in practice, and the real risks.
Read guide โSolar Permit Glossary
Plain-language definitions: AHJ, PTO, CAL, SLD, NEC, IBC, IFC, HVHZ, rapid shutdown, net metering, and more.
Read guide โTools to use alongside these guides
Permit Readiness Wizard
County-specific permit fees, inspections, and interconnection steps in 30 seconds.
Open โPayback Calculator
25-year ROI projection adjusted for your state's net metering program and the 30% ITC.
Open โSystem Size Calculator
How many panels do you need? Bill + location โ estimated kW, panel count, roof space.
Open โPermit Checklist PDF
Printable 4-section checklist: documents, inspections, interconnection, milestone log.
Download โInspection Day Checklist
What inspectors check at rough-in and final โ organized for inspection day prep.
Open โ